Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 11 results ...

Arditi, D, Elhassan, A and Toklu, Y C (2002) Constructability Analysis in the Design Firm. Journal of Construction Engineering and Management, 128(02), 117–26.

  • Type: Journal Article
  • Keywords: Constructability; Design; construction industry; design engineering; civil engineering; project management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2002)128:2(117)
  • Abstract:
    The timely execution of a construction project is very important to the owner, who makes plans and commitments on the basis of the project’s anticipated completion date. Failure of design professionals to consider how a builder will implement the design can result in scheduling problems, delays, and disputes during the construction process. Constructability of design is a subjective scale that depends basically on a number of interdependent project-related factors. Many design firms have a formal (explicit) constructability program that is launched as early as the conceptual planning stage of the project. This research examines design professionals’ efforts to pursue constructability and provides recommendations for performing constructability reviews in an efficient and effective manner.

Battikha, M G (2002) QUALICON: Computer-Based System for Construction Quality Management. Journal of Construction Engineering and Management, 128(02), 164–73.

Fredericks, T, Abudayyeh, O, Palmquist, M and Torres, H N (2002) Mechanical Contracting Safety Issues. Journal of Construction Engineering and Management, 128(02), 186–93.

Glagola, C R and Sheedy, W M (2002) Partnering on Defense Contracts. Journal of Construction Engineering and Management, 128(02), 127–38.

Gomar, J E, Haas, C T and Morton, D P (2002) Assignment and Allocation Optimization of Partially Multiskilled Workforce. Journal of Construction Engineering and Management, 128(02), 103–9.

Hajjar, D and AbouRizk, S M (2002) Unified Modeling Methodology for Construction Simulation. Journal of Construction Engineering and Management, 128(02), 174–85.

Kumaraswamy, M M and Morris, D A (2002) Build-Operate-Transfer-Type Procurement in Asian Megaprojects. Journal of Construction Engineering and Management, 128(02), 93–102.

Kwak, Y H (2002) Analyzing Asian Infrastructure Development Privatization Market. Journal of Construction Engineering and Management, 128(02), 110–6.

Que, B C (2002) Incorporating Practicability into Genetic Algorithm-Based Time-Cost Optimization. Journal of Construction Engineering and Management, 128(02), 139–43.

Thomas, H R, Horman, M J, de Souza, U E L and ZavÅ™ski, I (2002) Reducing variability to improve performance as a lean construction principle. Journal of Construction Engineering and Management, 128(02), 144–54.

Zhang, X Q, Kumaraswamy, M M, Zheng, W and Palaneeswaran, E (2002) Concessionaire Selection for Build-Operate-Transfer Tunnel Projects in Hong Kong. Journal of Construction Engineering and Management, 128(02), 155–63.